When it comes to using InnoGain on-site, the product is highly flexible. If weather conditions permit the curing of concrete – InnoGain can be used to form any through, anchor or precision holes required.

As a product which can be used up to 100 times and with minimal maintenance, InnoGain is extremely easy to introduce into site processes and even easier to install. The design of the product means that InnoGain cannot be removed until the concrete is fully cured, which negates any risk of installation error.

Delivering a neat and clean construction method, InnoGain removes the need for drilling and all the health and safety challenges associated with managing dust and vibration.

From a site management perspective, the removal of drilling also removes the need to safely dispose of concrete waste. Not only does this translate into time and cost savings, it makes a valuable contribution to the overall carbon impact of a project.